Huangqijia Industrial Zone, Liushi, Wenzhou, Zhejiang, China.
Huangqijia Industrial Zone, Liushi, Wenzhou, Zhejiang, China.
Huangqijia Industrial Zone, Liushi, Wenzhou, Zhejiang, China.
Mon To Fri 8AM to 5PM
Circuit Breaker

Meba electric fuse MBP41

Product Description

Meba electric fuse MBP41 is used in the single phase residual current of AC50/60Hz, rated voltage 220V or below for protecting electron circuit from overload and short circuit This product has advantages of high breaking capacity, small volume, width is only 18mm. Zero and live wire are cut off at the same time, preventing the person and fire danger. It is the ideal distribution protective switch in the civil residence field at present. This product conforms to the requirement of IEC60898.

Meba electric fuse MBP41

  Pole No.: 1P,2P,3P,4P
. Rated voltage: AC 230V
. Rated current (A): 63A, 80A,100A
. Tripping curve: C, D
. Rated short-circuit capacity(Icn): 4000A
. Rated frequency: 50/60Hz
. Energy limiting class: 3
.  Current Trip Curve: Type C: 5 a 10 In, Type D: 10 a 14 In

Features:

MAGNETIC COIL: ensures the switching of short-circuit, speaking within the following ranges: 5 to 10 times rated current (Type C), 10 to 14 times rated current (Type D)

BIMETAL: ensures the breaker trip when overloaded.

ARC CHAMBER: effectively dissipates the electric arc that is generated by the opening contacts of the trigger mechanism in the presence of an overload or short circuit.

Meba electric fuse MBP41

is used in the single phase residual current of AC50/60Hz, rated voltage 220V or below for protecting electron circuit from overload and short circuit This product has advantages of high breaking capacity, small volume, width is only 18mm. Zero and live wire are cut off at the same time, preventing the person and fire danger. It is the ideal distribution protective switch in the civil residence field at present. This product conforms to the requirement of IEC60898.

Inquiry Form - lucy from Meba
If you would like a quotation or further information on this product, please fill in the form below and we will reply to you within 1 working day.
All Electrical work must be done by a qualified licensed electrician.