Huangqijia Industrial Zone, Liushi, Wenzhou, Zhejiang, China.
Huangqijia Industrial Zone, Liushi, Wenzhou, Zhejiang, China.
Huangqijia Industrial Zone, Liushi, Wenzhou, Zhejiang, China.
Mon To Fri 8AM to 5PM
Electrical Accessories

Meba Power Built-in Type Photoelectric Switch BX5M-MFR

Product Description

Meba Power Built-in Type Photoelectric Switch BX5M-MFR using reflection type in parallel, the mutual spacing should be kept at over 1.4 times detection distance.

Meba Power Built-in Type Photoelectric Switch BX5M-MFR

Type Free voltage, Relay contact output
Model Retroreflective(*1)
BX5M-MFR
Dimension W25*H67*L81
Detecting Distance 0.1-5m
Detecting Target Opaque materials of Min. Φ60mm
Hysterisis —–
Response Time Max.20mS
Power Supply 24 TO 240VAC±10%50/60Hz, 24-240VDC±10%(Ripple P-P: Max10%)
Sensitivity —–
Operating Selectable light ON/D or Dark ON by slide switch
Control Output Relay contact output Capacity:30VDC 3A Resistive load, 250VAC 3A resistive load
Contact orde: 1C
Self-diagnostic Output Green LED turns on at unstable operation
Timer Function ON delay, OFF delay, selectable one shot delay by slide switch
Delay time: 0.1 to 5 sec adjustable by VR
Protection IP54(IEC Standard)

Meba Power Built-in Type Photoelectric Switch BX5M-MFR

Meba Power Built-in Type Photoelectric Switch BX5M-MFR Method of anti mutual-interference and cautions:

-Mutual cross installation of optic projector and photo-receptor.

-When using reflection type in parallel, the mutual spacing should be kept at over 1.4 times detection distance.

-The mains voltage should be within the range of operating.

-The following installation occasions will result in error action, take note of:

1. Dusty occasion

2. The occasion with corrosive gas

3. The occasion directly spattered with water, oil and agent etc

4. Outdoor or the occasion directly shine by hard light like sunlight

Inquiry Form - lucy from Meba
If you would like a quotation or further information on this product, please fill in the form below and we will reply to you within 1 working day.
All Electrical work must be done by a qualified licensed electrician.